how to build your own flexible LED Display XXL WS2811 real time Video Transmission
LED DIY WS2811, LED WS2801, LED MY9221, T1000S SD Controller ,build a LED Display, LED Soften Display, build high Power LED, how to build a LED display, how to build a own LED display low coast useful, laser, LED ic controled strips, LED strips, LED technic, flexible LED display, LED curtain, Low coast flexible LED Display, elektric-junkys.com
Friday, July 1, 2022
Sunday, May 22, 2022
Saturday, January 15, 2022
Saturday, December 4, 2021
Monday, January 5, 2015
how to build your own flexible LED Display XXL WS2811 real time Video Transmission
DIY How to build your own flexible
LED Display Curtain XXL P16.6 realtime Video Transmission
Here we going to show you how to build a FLEXIBLE "ROLL AND FOLDABLE" LED Display WS2811. cheap easy and very useful Advertiser
TOOLS
.:
- Side cutter (sharp)
- Screwdrivers mix (cross, slot, big & small)
- Hot Iron (sharp tip)
- Solder (thin)
- Heat gun shrinkable tubing Puncher (to hole the Plane)
- Detergent (cleaning)
First buy, order, collect all the needed Components for this Project, the most accessories are Optional means they’re modified for my project you can change the accessories like color of the PCBA waterproof or non Waterproof of the led strip IP65/IP68/and more, for this project we use an LED WS2811 realtime Video Controller LED Live transmission controller, The Surface you can change to different materials or colors. We are useing here an PVC Banner Flexible, robust, easy assembling, nice look ...
We offer all the accessories and assembling parts for this project and many other LED projects (TOP PRICE TOP QUALITY incl. WARRANTY) so we will assist you for questions and Price inquires.
WARNING = BE AWARE OF CHEAP CRAP LED STRIPS (low price)
THERE ARE A LOT OF SCAMMERS ON THE MARKET HERE USE REFURBISH CHIPS SECOND HAND IC´S SECOND ASSEMBLY PARTS AND MORE:::
THIS WILL CAUSE A LOT OF FAILURES AND SHORTER LIFETIME
THERE ARE A LOT OF SCAMMERS ON THE MARKET HERE USE REFURBISH CHIPS SECOND HAND IC´S SECOND ASSEMBLY PARTS AND MORE:::
THIS WILL CAUSE A LOT OF FAILURES AND SHORTER LIFETIME
Assembly Parts.:
Surface
(depending on your need flexible or fix)
LED Supply
Power
Supply´s (5v depending on qty of LED Source)
Controller
(Life transmittion controller)
Fast
Connectors
Shrinking
Tube ( to cover and protect your connections)
for free tell us if you want us to send you some Meters for free by
for free tell us if you want us to send you some Meters for free by
so lets start ....
step. 1
Cut 2cm shrink tube pieces
(for the soldering place calculate 2pcs each line)
Cut the connection
bridge wires for each line
Cut shrink tube pieces
cover it over your wire connection (use the heat gun to make them tight)
Cut your Power +red and
ground wires you need (for the controller and for the Power supply)
remember for this project
WS2811 we need each 8thmeter a new CURRENT supply
60leds mtr 120leds 2mtr
1Line, 480pcs LED´s you can calculate the watts depending on your LED supply
Connect your
controller create the CBX file (support questions) and connect 3-4 lines
first and test if "anything is working or shining you also can use the SD
card of the realtime controller to see if it runs ..
include the vertical
distance of each string line into your calculation
Example. how do i
calculate LED strips for LED Display, how to caculate LED strip lines for
display =
Strip Length , Strip width
+ your customized distance of each string. Means
if you want to build a
1000mm high display go on like that. 1000 / strip width + distance = how many
strip lines you have to cut /5000mm is one roll then you know exactly how
many rolls of WS2811 LED Strip you need for your project !
Now you’re able to cut your calculated
numbers of LED strings on your requested length.
Now grab your prepared bridge connection
cables and place them on your strings ,
use the hot iron to soldering one by one bridge
wire to strip don’t mess up with the the input and output of LED
strip take care on the arrows
Soldering the strips in a series circuit
means the start of the first strip is every time INPUT, you can start
everywhere you want with the INPUT but later in the software you have to change or
setup your PORT. !
Don’t forget to cover a short 20mm pcs
shrink tube over the strip before you soldering the wire otherwise you have to
remove the solder again and cover the shrink tube it’s easier to cover them
before. pull the shrinkpiece far enough inside that the heat will not shrink
him to early .
After use the heat gun you should bring
the strip lines and the connecting wire in ENDPOSITION hold it by hand till the
shrink tube will become cold and tight, you can form it as you like, after
some seconds it’s tight and will not move again stay in position. !
Place your LED strip
construct to the surface.
BRING
IT IN POSITION use the meter stick to fix each distance that the strip
construct later Placed well in exactly the middle of your surface.
Now
you can fix the first LED strip line peel the paper from the backside of the
strip (glue), hold one side to the up and start from the other side to fix it.
Use
your meter stick or caliper to recheck if your strip is straight in position..!
IMPORTANT.:
If you start to place the first line awry the deviation in the end will be much
bigger and later show each awry placements and BIG deviation.
Use
the Puncher to place a little hole EXACLY under the start of the LED strip Input,
put the input wire through the hole. Place
the SD controller on the backside of the surface by adhesive tape double sided,
connect the wires from the input with the SD controller, connect your power
supply and you’re done.
Thanks
for watching....
Subscribe to:
Posts (Atom)